Optical Communication Products · Shenzhen, China
Tel: +86 0755 23766314  ·  marketing@fotfiberoptic.com
Request a Quote

MPO/MTP Cleaner & Inspection Kit

SKU: FOT-MPO-CLEAN · Test & Maintenance

One-click MPO cleaner plus fibre-end inspection probe.

~800Cleans per cartridge
MPO tipInspection probe
IEC 61300-3-35Pass/fail grading
Both polishesAPC & UPC
Kit content
Cleaner + inspection probeCleaner onlyInspection probe onlyCleaner + 5 spare cartridges
Probe output
Built-in displayUSB-C to PCWi-Fi to phone/tablet
Also clean
MPO onlyMPO + LC + SCMPO + LC + SC + FC/ST
Configured part numberFOT-MPO-CLEAN
Ships worldwide
Built to your configuration
3-year warranty

Product Overview

Contamination is the single most common cause of MPO link failures, and an MPO ferrule fails twelve fibres at once. This is the kit that prevents that: a click-action cleaner that wipes the whole ferrule in one stroke, and an inspection probe with an MPO tip so you can see the result before you mate the connector.

Assemblies are built on US Conec MTP® ferrules and terminated in a controlled environment, then measured fibre by fibre. Interferometry checks the three geometry parameters that decide whether a multi-fibre ferrule mates properly — radius of curvature, apex offset and fibre height — and every end face is inspected and graded to IEC 61300-3-35 before the dust cap goes on.

Fibre count, fibre type, polish, polarity, gender, jacket rating, leg length and overall length are all build options rather than catalogue limits. Use the selector above to configure the exact assembly and the specification table will follow your choices; the measured test report ships with the cable.

Technical SpecificationsUpdates with your selection

Optical
PortsMPO / MTP ferrule, 8F to 32F
Connector PolishAPC and UPC — both supported by the same tip
Inspection Magnification200× and 400× switchable
Grading StandardIEC 61300-3-35 automated pass/fail
Mechanical & Environment
Cleaner TypeOne-click, dry-cleaning reel cartridge
Cleans per Cartridge≈ 800
Cleaner CoverageFull ferrule end face in a single stroke, including guide-pin holes
Probe Tips IncludedMPO male and MPO female tips
Probe OutputBuilt-in 5-inch display, battery powered
CaseFoam-lined hard case
ComplianceRoHS
Testing, Quality & Supply
Optical Test100% — every fibre measured for insertion loss and return loss before shipment
Ferrule GeometryInterferometer-verified: radius of curvature, apex offset and fibre height to IEC 61755-3
End-Face InspectionEvery ferrule inspected and graded to IEC 61300-3-35
Test ReportPer-fibre measured data supplied with the assembly, traceable to the serial number
Connector SourceUS Conec MTP® ferrules; genuine-brand or FOT MPO to your preference
CustomisationFibre count, type, polish, polarity, gender, jacket, leg length and overall length built to order
Lead TimeStock configurations 3–5 days; custom builds 7–10 days
Warranty3 years

Ordering Information

Part NumberConfigurationFibre countAvailability
FOT-MPO-CLEANStandard configuration—Build to order
FOT-MPO-CLEAN-CLNKit content: Cleaner only—Build to order
FOT-MPO-CLEAN-PRBKit content: Inspection probe only—Build to order
FOT-MPO-CLEAN-CLN5Kit content: Cleaner + 5 spare cartridges—Build to order
FOT-MPO-CLEAN-USBProbe output: USB-C to PC—Build to order
FOT-MPO-CLEAN-WIFIProbe output: Wi-Fi to phone/tablet—Build to order

Part numbers are indicative. Send us the fibre count, type, polish, polarity, gender, jacket and length and we confirm the exact build code on the quotation.

Quality & What's in the Box

Measured Fibre by Fibre

Insertion loss and return loss recorded for every fibre, not sampled.

Geometry Verified

Interferometer data on ferrule radius, apex offset and fibre height.

Inspected & Graded

Every end face checked against IEC 61300-3-35 before packing.

Packaging

Dust-capped, coiled on a reel or in a bag with the test report and pulling sock.

Typical Applications

Data Centre Spine & Leaf

Parallel 40G/100G/400G/800G backbone between spine, leaf and top-of-rack panels.

AI / GPU Clusters

Rail-optimised accelerator fabrics where one switch port breaks out to several GPUs.

Structured Cabling

Pre-terminated backbone that installs in hours instead of days, with the loss budget known up front.

Test & Commissioning

Loopbacks, attenuators and inspection for proving ports before the link goes live.

Frequently Asked Questions

Do I really need to inspect, or is cleaning enough?

Inspect. Cleaning without inspection is guessing — you cannot tell from the outside whether the ferrule is clean, whether you have just smeared a particle across the end face, or whether the problem was a scratch all along. Inspect, clean if it fails, inspect again. It takes under a minute and it is the difference between a link that works and a fault ticket.

Does one cleaner handle both APC and UPC?

Yes — the click cleaner wipes the whole end face, so the polish angle does not matter. What does matter is male versus female: the guide-pin holes on a female ferrule need the tip that reaches into them, which is why both tips are in the kit.

How is the assembly labelled?

Both ends carry a printed label with the part number, fibre count, fibre type, polarity type and the serial number, and breakout legs are individually numbered. Tell us your own labelling convention on the RFQ and we print to it — it costs nothing and it saves an afternoon at installation.

Can I get free samples before ordering volume?

Yes. We supply qualification samples so you can measure the loss and check the fit in your own panels before committing. Per-order test reports are standard, and sample reports can be provided in advance for tender documentation.

Related MPO / MTP Products

Request a quote for this part

Tell us the platform and the quantity. An engineer checks the part against your switch and software version before quoting — if it will not work, we say so.

Goes to our engineers and the quotation desk together. Replies come from sales@topnetsystem.com, usually within one working day.